There may be a power shortage from now till May 25 as the intense heat wave triggers a spike in electricity demand, alongwith the drought that drains reservoirs, he said.
Given this, the leader asked the Vietnam National Coal-MineralIndustries Holding Corporation Limited and North-East Corporation to supply sufficientcoal to thermal power plants that use domestic coal.
Relevant ministries and agencies should engage innegotiations with wind and solar power projects that are now ready to be connectedto the national power grid, with provisional pricing.
Deputy Minister of Industry and Trade Dang Hoang Anwas tasked with directly instructing the Vietnam Electricity in rolling outsolutions to operate the national power system, ensure electricity supply andprevent power shortages./.