The flyover is expected to help reduce long-lastingcongestions at the Chua Boc-Pham Ngoc Thach-Ton That Tung-Dong Tacintersection.
It has two lanes for cars and motorbikes, with a totallength of 318m and a width of 9m.
Construction on the overpass took place in 10 months, at a cost of 147 billion VND (6.2 million USD)./.