The40-billion VND (2.2 million USD) facility, the second of its kind tohave been built at the Nam Son waste treatment complex, is capable oftreating 1,000 m3 of wastewater a day.
Four years ago, URENCO put its first plant into operation, which wasdesigned to treat 500 m3 of wastewater. The plant cost 18 billion VNDto build./.