The plant’s phase1 was built at a cost of 180 billion VND (8.1 million USD) in Suoi Binh hamlet,Dong Tien commune, Dong Phu district. It also has a system to treat liquidwaste with a capacity of 20 cu.m per hour.
The plant willbe expanded to cover 36 hectares with an investment of 320 billion VND (14.5million USD).-VNA